Case Studies

“Real-Word Savings – Proven Success Stories”

Case Study: 1

  • Client: Gated Community In Coimbatore
  • Challenge: Rising electricity costs and frequent pump failures.
  • Solution: Installed a 75 KLD Bioman BIOSTP plant.
  • Outcome: 15 lakh annual savings with zero downtime.

Case Study: 2

  • Client: Hallmark Sapphire Apartment (Mahindra World City)
  • Savings: ₹7.2 lakh annually
  • Challenge: High maintenance cost.
  • Solution: Replaced existing STP with Bioman BioSTP.
  • Result:  Zero smell and complete use of water for garden.

Case Study: 3

  • Client: Residential Complex in Bengaluru
  • Plant Size: 100 KLD
  • Savings: ₹ 18 lakh annually
  • Challenge: High maintenance and frequent breakdowns with old STP.
  • Solution: Installed a Bioman BIOSTP unit.
  • Outcome: 70% reduction in operational costs.

Case Study: 4

  • Client: Upashana Hotels Kanchipuram
  • Plant Size:  120 KL
  • Savings: ₹21 lakh annually
  • Challenge: High energy consumption.
  • Solution: Installed a Bioman BIOSTP unit.
  • Result: 80% reduction in operational costs.